How a building goes up with us.

Seven phases, one site team and a report every week. Scroll, and the tower builds itself phase by phase.

Phase 01 · Survey

Before anything moves, we measure.

The site is fenced, the grid is set out to the millimetre, and the welfare cabins arrive. Nothing gets built on a guess.

Plot
44 × 32 m
Set-out
±5 mm
Hoarding
152 m

Phase 02 · Excavation

The ground comes out in benches.

5,280 cubic metres of spoil leave the site by truck while the pit is checked, shored and kept dry.

Pit
30 × 22 m
Depth
8 m
Spoil
5,280 m³

Phase 03 · Foundations

20 piles, one raft.

Bored piles go down to rock. On top of them, a concrete raft a metre and a half thick carries the whole building. Then the basement walls close the pit.

Piles
20 × Ø1.0 m
Raft
28 × 20 × 1.5 m
Mix
C40

Phase 04 · Structure

Columns, beams, slab. 14 times.

The core goes up first and the floors follow, one every six days. The tower crane climbs with the building.

Floors
14
Floor to floor
3.6 m
Height
50.4 m

Phase 05 · Envelope

Weather-tight, floor by floor.

Unitised glass panels, glazed and sealed in the factory, are craned into place and locked to the slab edges.

Panels
560
Glazing
3,024 m²
Module
2.0 × 3.6 m

Phase 06 · Topping out

The crane comes down.

Parapets, plant and the roof screens go on. The crane that built the tower is dismantled in pieces, the same way it went up.

Parapet
1.2 m
Roof plant
3 units
Crane out
3 days

Phase 07 · Handover

Lights on. Keys over.

Paving laid, trees planted, lights on. 14 floors, 41 weeks, ready for its first tenants.

Trees
14
Public realm
44 × 32 m
Handover
week 41

Why Northstone

Three promises we put in the contract.

Most contractors talk about quality. We write the programme, the price and the safety record into the agreement, and we report against all three every week.

  • 01

    Fixed price, fixed programme

    The number you sign is the number you pay. Changes are priced before they happen, never after.

  • 02

    One team, start to finish

    The site manager who digs the pit hands you the keys. No handoffs between phases, no lost knowledge.

  • 03

    Safety is the schedule

    Every programme is built around safe sequencing. A site that runs safely runs on time.

By the numbers

312
Projects delivered
1.6M m²
Floor area built
98%
Handed over on programme
23
Years in business
14,442

hours since the last lost-time incident, across every live site.

How we work

The programme is the promise.

  1. 01

    Pre-construction

    Design review, costed programme, planning and procurement. You sign a fixed price before a spade goes in.

  2. 02

    Build

    One site team from excavation to envelope. Weekly reports with photos, progress against programme and spend to date.

  3. 03

    Handover

    Snagging closed before the walk-through, not after. O&M manuals, warranties and training delivered on the day.

  4. 04

    Aftercare

    Twelve months of defects cover with a named contact and a 48-hour response.